logo Kompas.id
EnglishTo prevent blackouts due to...
Iklan

To prevent blackouts due to drought, electricity in Sulbagsel is supplemented by diesel

The long drought has caused water discharge, the main source of hydroelectric power generation, to decrease.

This article has been translated using AI. See Original .

By
ADITYA PUTRA PERDANA
· 5 minutes read
Condition of the Bakaru Hydroelectric Power Plant in Pinrang Regency, South Sulawesi, mid-October 2023. Water discharge is reduced due to drought.
DOKUMENTASI PLN SULSELRABAR

Condition of the Bakaru Hydroelectric Power Plant in Pinrang Regency, South Sulawesi, mid-October 2023. Water discharge is reduced due to drought.

JAKARTA, KOMPAS — The government together with PT Perusahaan Electric Negara (Persero) ensures a gradual increase in electricity supply in Southern Sulawesi produced from diesel power plants and mobile power plants. This was done in anticipation of a recurrence of electricity supply shortages in the region due to drought which caused rolling blackouts in 2023.

In 2023, rotating power outages will occur in the Southern Sulawesi region (Sulbagsel) which is partly due to the prolonged dry season. The long drought has caused water discharge, the main source of hydroelectric power generation (PLTA), to decrease. As a result, the electricity supply dropped. However, the various power plants in Sulbagsel can anticipate this.

Editor:
AUFRIDA WISMI WARASTRI
Share
Logo Kompas
Logo iosLogo android
Kantor Redaksi
Menara Kompas Lantai 5, Jalan Palmerah Selatan 21, Jakarta Pusat, DKI Jakarta, Indonesia, 10270.
+6221 5347 710
+6221 5347 720
+6221 5347 730
+6221 530 2200
Kantor Iklan
Menara Kompas Lantai 2, Jalan Palmerah Selatan 21, Jakarta Pusat, DKI Jakarta, Indonesia, 10270.
+6221 8062 6699
Layanan Pelanggan
Kompas Kring
+6221 2567 6000